Project Details

(a) Channelization of Gomti River (8.1 km). By Constructing Diaphragm wall and landscaping on both banks.
(b) Trunk Drain Construction of the intercepting drains on both sides of the river.
(From Sitapur-Hardoi Road Bypass to Shaheed Path).

scope of Project

(a) Channelization of Gomti River (8.1 Km.) 656.00 Crore
(b) Trunk Drain 311.00 Crore
  Total 967.00 Crore